CommercialFlagship Project

Paseo la Galería

Asunción
Paseo la Galería — Proyecto ejecutado por Casa Clima E.A.S.
Project Scope

On-Site Execution Modules

  • Central Ducted Climate Control for Mechanical Walkway
Engineering SpecificationsID: proj-07
Typology / Use
Commercial
Installed Systems
Centralized Air Conditioning System
Engineering Summary

Centralized ducted climate control system for mechanical walkway.

Technical Advisory & Quote

Do you have a project with similar technical requirements?

Our engineering staff evaluates architectural blueprints, performs thermal load calculations, and sizes climate control, ventilation, and pressurization systems for projects across Paraguay.